Construction Advisory
As a part of the Harris County Flood Control District’s overall maintenance operations, the Flood Control District is undertaking multiple comprehensive projects to evaluate and, if necessary, de-silt channels for which the Flood Control District has property rights that drain directly to the Addicks reservoir. In addition, this program will evaluate repair impacts, and develop construction and maintenance plans, in coordination with the U.S. Army Corps of Engineers as appropriate. This Program is part of an ongoing effort to ensure the channels in the Addicks watershed are functioning at design capacity as they carry stormwater out of surrounding neighborhoods and into the federal reservoir.
Residents in the neighborhoods surrounding Langham Creek, South Mayde Creek, Bear Creek and Horsepen Creek, and its tributaries, will begin to see construction activity around these waterways which will include trucks and heavy machinery. Residents are urged to respect all warning signs, and avoid trails and sidewalks which may be temporarily impacted as work crews move around the area. Additionally, residents may see trucks on neighborhood streets which are necessary to haul debris and sediment from the creek beds. For further information please visit www.HCFCD.org/F53.
The Flood Control District works to reduce flooding across the region and is committed to keeping residents informed. If you have any questions, you can reach the Flood Control District at 346-286-4000, or email communications@hcfcd.hctx.net.